The site office for the project is finally finished and ready for it's trip down to Mallorca.
Originally a mobile water treatment laboratory, the trailer was completely stripped down by the team and rebuilt - complete with new A frame - for the trip. Once installed at the windmill site, the trailer will house the water treatment facility as well as serving as site office for the archaeological dig.
Chris relaxes in front of the site office, waiting for the ferry from Toulon, after a long, long 18 hour drive down from the UK. The size and weight of the trailer meant that top speed was limited to around 60kph.
398 80 | 179 views |