First equipment en route
The first load for the site is en route via Toulon. The bulk of the load consisted of the bio-digester - a solar powered piece of kit that will handle all waste water on the site.
The first load for the site is en route via Toulon. The bulk of the load consisted of the bio-digester - a solar powered piece of kit that will handle all waste water on the site.